Scroll

Energy storage system for the Trzy Fale Water Park in Słupsk

BPR ASE GROUP, in cooperation with Elmech-ASE S.A., is responsible for the design, delivery, and installation of a battery energy storage system (BESS) with a capacity of 2 MW and 4 MWh, to be built at the Trzy Fale Water Park in Słupsk.

 

This advanced technological solution will:

  •  be integrated with the existing power system of the wastewater treatment plant,
  • operate in cooperation with a stable cogeneration (CHP) source, support on-site self-consumption of electricity.