Scroll

DCT Gdańsk Terminal

We designed a deep-water container terminal. It is the largest investment of this kind both in Poland and in the Baltic Sea region.

 

The terminal’s handling capacity was 500,000 TEU in the first phase of construction and ultimately reached 1 million TEU. The facility includes two berths with depths of 13.5 m and 16.5 m along a 650 m container quay, designed to accommodate Post-Panamax vessels with an overall length of 320 m and a capacity of up to 7,100 TEU. The terminal is also equipped with a Ro-Ro ramp.

 

Source: Baltic Hub

30 ha of storage and maneuvering yards, service buildings.